+

Track Chain Assembly for Hitachi EX1200-6 Excavator | YA00057804

Hitachi EX1200-6 Excavator YA00057804

Keywords:

  • Detail
    • Commodity name: Track Chain Assembly for Hitachi EX1200-6 Excavator | YA00057804

    Hitachi EX1200-6 Excavator YA00057804

     

    Track Chain Assembly for Hitachi EX1200-6 Excavator | YA00057804

     

    Product Overview

    The track chain assembly (also known as track link assembly) is a critical undercarriage component of your Hitachi EX1200-6 mining excavator. This precision-engineered assembly consists of interconnected track links, bushings, and pins that form the continuous loop around the undercarriage. The track chain engages with the drive sprocket, travels around the idler and rollers, and supports the 112-ton machine while providing traction in demanding mining environments .

    The Hitachi EX1200-6 is a 112-ton class mining excavator manufactured from 2007 to 2012, powered by a Cummins QSK23 engine producing 567 kW (760 HP) . This genuine Hitachi track chain assembly (Part No. YA00057804) is engineered to exacting OEM specifications for perfect fit, reliable performance, and maximum service life in demanding mining environments.

    This is a genuine Hitachi original equipment part.

     

    Technical Specifications

    Parameter

    Specification

    Part Number

    YA00057804

    Manufacturer

    Hitachi Construction Machinery

    Component Type

    Track chain assembly / Track link assembly

    Application

    Undercarriage track system

    Machine Model

    EX1200-6 Mining Excavator

    Operating Weight

    112 t (112,000 kg)

    Engine Power

    567 kW (760 HP)

    Engine Model

    Cummins QSK23

    Track Width

    710 mm

    Track Type

    Sealed and lubricated track

    Link Material

    Forged heat-treated alloy steel (35MnB/40Mn2)

    Surface Hardness

    HRC53-58

    Bushing Type

    Deep induction-hardened, sealed

    Pin Type

    Precision-ground, heat-treated

    Seal Type

    Duo-Cone floating seal system

    Master Link Type

    Offset / Bolt-on (verify configuration)

    Please verify exact specifications with your machine's technical manual or existing component.

     

    EX1200-6 Undercarriage Overview

    The Hitachi EX1200-6 features a reinforced undercarriage system designed for extreme mining conditions. This mining-class excavator works under extreme loading forces, abrasive ground materials, and nonstop operational cycles .

    Component

    Function

    Track Chain Assembly (YA00057804)

    Continuous chain with pins and bushings

    Track Shoes

    Individual pads bolted to links for ground contact

    Drive Sprocket

    Engages bushings to propel machine

    Track Idler

    Maintains track tension at front

    Track Rollers (Lower)

    Support machine weight on track frame

    Carrier Rollers (Upper)

    Support upper track run

    Track Adjuster Cylinder

    Hydraulic cylinder for tensioning

     

    Key Undercarriage Features

    • 710 mm track width provides excellent flotation and stability
    • HD (Heavy Duty) undercarriage designed for mining applications
    • Sealed and lubricated track design extends component life

     

    Track Chain Components

    The track chain assembly (YA00057804) integrates several critical components :

    Component

    Description

    Track Links

    Forged from high-tensile alloy steel (35MnB/40Mn2), heat-treated for exceptional resistance to cracking and stable mechanical strength under massive compression. Forging eliminates internal voids and improves grain uniformity .

    Track Bushings

    Deep induction-hardened outer and inner surfaces. The hardening process enhances resistance against metal-to-metal friction and abrasive penetration from fine minerals .

    Track Pins

    High-strength steel, precision-ground, heat-treated, inserted between links to create a flexible, load-bearing chain .

    Master Link

    Removable link for track assembly/disassembly. Typically offset design for easier field service.

    Seals

    Sealing system prevents grease leakage and contaminant ingress .

    Track Shoes

    Individual pads bolted to each link for ground contact (order separately).

     

    Function & Operation

    Function

    Description

    Weight Distribution

    Transfers machine weight to track shoes and ground via rollers

    Propulsion

    Pin and bushing engagement with drive sprocket transfers torque to ground

    Articulation

    Links pivot at pin and bushing joints, allowing track to wrap around sprocket and idler

    Shock Absorption

    Absorbs impact loads during travel over obstacles

     

    Operating Principle

    1. Drive sprocket engages track bushings
    2. Sprocket rotation pulls track chain around undercarriage
    3. Track links articulate at pin and bushing joints
    4. Track chain transfers motion to track shoes
    5. Shoes contact ground, propelling the 112-ton machine
    6. Idler and adjuster maintain proper track tension

     

    Wear Mechanism

    As the track chain operates, the following progressive wear occurs :

    • Pin and bushing outer surfaces wear from sprocket engagement
    • Pin and bushing internal surfaces wear from articulation
    • Track chain "stretches" as pin/bushing clearances increase
    • Seal failure leads to contamination ingress, accelerating wear
    • Proper lubrication and tension management extend service life

     

    Compatible Hitachi Models

    Series

    Models

    Primary

    Hitachi EX1200-6 Mining Excavator

    Also Compatible

    EX1200, EX1200-5, EX1200-7

    Important:Please verify your machine's serial number with our parts department to ensure correct compatibility. The EX1200-6 was manufactured from 2007 to 2012 with serial numbers requiring verification .

     

    Genuine Hitachi Quality

    Component

    Feature

    Benefit

    Track Links

    Forged high-tensile alloy steel (35MnB/40Mn2)

    Exceptional resistance to cracking, stable mechanical strength under massive compression

    Bushings

    Deep induction-hardened surfaces (HRC53-58)

    Extended wear life, stronger resistance to internal wear

    Pins

    Precision-ground, heat-treated

    Smooth articulation, long service life

    Seals

    Duo-Cone floating seal system

    Superior contamination protection, retains lubrication

    Master Link

    Offset design for easy assembly

    Simplified field installation

    Surface Protection

    Industrial-grade coating

    Protects against rust, humidity, and chemical corrosion

     

    Key Features

    • Sealed and lubricated track design for extended life in abrasive mining environments
    • Deep induction-hardened bushings for maximum wear resistance
    • Precision-forged links with uniform grain structure
    • Reinforced link profile for heavy impact and rock abrasion resistance
    • OEM-standard pitch for perfect compatibility with EX1200-6 undercarriage components
    • Tested under toughest mining conditions
    • Direct replacement for original equipment

     

    Common Failure Signs

    Symptom

    Likely Cause

    Track noise (squeaking, popping)

    Worn pins and bushings, lack of lubrication, seal failure

    Excessive track sag

    Pin and bushing wear, track chain stretch

    Track derailment

    Worn components, improper tension, flange wear

    Sprocket jump (track skipping)

    Worn bushings, improper sprocket engagement

    Uneven link wear

    Misalignment, worn rollers

    Track chain measurement exceeds limit

    Pin and bushing wear beyond service limit

    Master link failure

    Fatigue, improper installation

    Seal leakage

    Duo-Cone seal damage, contamination ingress

     

    Genuine Part Assurance

    Assurance

    Detail

    Authenticity

    100% genuine Hitachi part

    Condition

    New

    Warranty

    Full Hitachi manufacturer's warranty

    Packaging

    Original Hitachi heavy-equipment industrial packaging

    Origin

    Japan

    Note:Hitachi Genuine Parts are manufactured using high-quality materials and tested under the toughest conditions to guarantee reliable performance.

     

    Installation Guidelines

    Critical Requirements

    1. Verify part number matches your machine's requirements
    2. Prepare adequate heavy lifting equipment - Track chain is extremely heavy
    3. Support machine securely with proper blocking
    4. Relieve track tension before removal using track adjuster grease valve
    5. Use proper track tools for master link and chain handling
    6. Reference EX1200-6 Workshop Manual for complete procedures

    Installation Steps

    1. Position machine on level ground, block securely
    2. Relieve track tension using track adjuster grease valve
    3. Remove track shoes from old chain (if reusing shoes)
    4. Remove master link bolts and separate master link
    5. Remove old track chain assembly
    6. Clean sprocket, rollers, and idler surfaces thoroughly
    7. Inspect undercarriage components for wear
    8. Position new track chain assembly (YA00057804) around undercarriage
    9. Align master link and install connecting pins
    10. Install master link bolts and torque to Hitachi specifications
    11. Install track shoes with new bolts (if not pre-assembled)
    12. Apply track tension to specification using track adjuster
    13. Test track operation in forward and reverse at low speed
    14. Re-torque master link bolts after initial operation
    15. Re-check and adjust track tension after test operation

     

    Post-Installation

    • Verify smooth track operation in both directions
    • Check for proper sprocket engagement with bushings
    • Inspect for unusual noise during travel
    • Monitor track tension during initial operation
    • Re-tension after break-in period (typically 50 hours)

     

    Replacement Strategy

    Due to the interdependent nature of undercarriage components, it is standard and highly recommended practice to replace the track chain together with the drive sprocket as a matched set. Worn sprockets will rapidly accelerate wear on a new track chain, and vice versa.

    IMPORTANT:Installation must only be performed by qualified mining equipment technicians following procedures in the EX1200-6 Workshop Manual.

     

    Maintenance Recommendations

    Interval

    Maintenance Task

    Daily

    Visual inspection for damage, check track tension, listen for unusual noise

    Weekly

    Check for loose track shoe bolts, inspect for seal leakage

    Monthly

    Measure track sag, adjust tension as needed

    Every 500 hours

    Measure pin and bushing wear

    Every 1000 hours

    Perform detailed undercarriage inspection

    Every 2000 hours

    Complete track chain wear measurement, sprocket inspection

    As Needed

    Replace when wear limits are reached

     

    Track Tension Management

    Maintaining proper track tension is critical for pin, bushing, and sprocket life:

    • Overtightening increases rolling resistance and load on pins/bushings
    • Undertightening causes track whipping and uneven wear
    • Refer to EX1200-6 Operator's Manual for specific track sag specifications

     

    Critical Notes

    • Always use genuine Hitachi replacement parts
    • Undercarriage wear is a major maintenance cost on 112-ton excavators
    • Regular pin and bushing measurement extends track life
    • Worn tracks accelerate sprocket, roller, and idler wear significantly
    • Replace undercarriage components in sets for even wear distribution
    • Seal integrity directly dictates the service life of the track chain

     

    Ordering Information

    Part Number:YA00057804

    Product Name:Track Chain Assembly / Track Link Assembly (Genuine Hitachi)

    Application:Hitachi EX1200-6 Mining Excavator

    Also Fits:EX1200, EX1200-5, EX1200-7

    Condition:New Genuine OEM Part

     

    Recommended Related Parts

    Component

    Part Number

    Notes

    Track Shoe

    Contact parts department

    Order separately

    Drive Sprocket

    Contact parts department

    Replace as matched set

    Track Roller (Lower)

    Contact parts department

    Inspect during track replacement

    Carrier Roller (Upper)

    Contact parts department

    Inspect during track replacement

    Track Idler

    Contact parts department

    Inspect during track replacement

    Track Adjuster Seal Kit

    Contact parts department

    If adjuster service needed

     

    Quantity per Machine

    The Hitachi EX1200-6 is equipped with 2 track chain assemblies (1 per side).

     

    Track Shoe Options

    Track chain assemblies can be supplied with or without track shoes. Track shoe configurations include:

    • Double grouser (standard for mining)
    • Single grouser (for less aggressive terrain)
    • Rubber pads (for roading applications)

    Please specify your track shoe requirements when ordering.

     

    Service Manual Reference

    The EX1200-6 track chain and undercarriage system are documented in the following factory service publications:

    Document

    Reference

    Content

    Workshop Manual

    EX1200-6 Workshop Manual

    SECTION 3 UNDERCARRIAGE - Track

    Technical Manual (Operational Principle)

    EX1200-6 Technical Manual

    Component operation theory

    Technical Manual (Troubleshooting)

    EX1200-6 Technical Manual

    Diagnostic procedures

    For complete service information including torque specifications and wear limits, refer to the official Hitachi EX1200-6 Workshop Manual.

     

    Product Source Information

    The track chain assembly YA00057804 is available through authorized Hitachi parts distribution channels. For EX1200-6 undercarriage components, it is recommended to contact parts specialists with your machine serial number for accurate compatibility verification. The EX1200-6 was manufactured from 2007 to 2012, and serial number verification is important for ensuring correct fitment .

     

    Hitachi EX1200-6 is a registered trademark of Hitachi Construction Machinery. All genuine parts are sourced through authorized distribution channels. Specifications and design subject to change without notice.

     

     

     

     

Factory

Factory 05

Factory 05

Factory 04

Factory 04

Factory 03

Factory 03

Factory 02

Factory 02

Inquiry

We will contact you within one working day. Please pay attention to your email.

Product name:

Submit Now

Obtain A Quotation

Note: Please leave your email address, our professionals will contact you as soon as possible!

Submit